As a leading manufacturer of data centre solutions for over 25 years, we have a wealth of experience in both new build data centres and retrofitting existing sites. The case studies on this page provide examples of some of the services we offer.

p1506656819-5

6 Degrees

6 Degrees

6 Degrees operates Tier 4 aligned datacentres, designed to host mission critical computer systems in a secure environment.

p1506680282-6

NetBenefit

NetBenefit

NetBenefit was looking to improve its environmental performance, reduce its energy consumption and enhance its control over temperatures within the datacentre.

yahoo_cabinets2

Yahoo

Yahoo

Yahoo approached Dataracks to look at ways to eliminate hot spots and improve the life expectancy and efficiency of its London datacentres.

p1506691349-6

Interxion

Interxion

When Alex Mason, Customer Implementation Manager for Interxion saw the hot air escaping around the sides of the server rack cabinets and being sucked back into the servers, he knew that cold aisle containment was the best way to improve energy efficiency in his data centre.

awesome-microsoft-sign-outside-building

Microsoft

Microsoft

In March 2011, as part of an overall energy efficiency management project, Microsoft UK began working with Dataracks. Microsoft believed improvements could be made within their Data Centre on the UK Corporate Head Office site in Thames Valley Park, near Reading.

10

University of East Anglia

University of East Anglia

The University of East Anglia (UEA) is one of the leading green technology institutions in the UK. Students and staff are encouraged to think about what they do and its environmental impact. As part of this, the UEA runs its own Green Impact Awards every year to encourage innovation in the field of environmental impact within the university and beyond.